Yukon & Donnelly Training Area Electrical Upgrades

Repaired an six mile corridor of power poles and high-voltage lines which were damaged in a severe ice storm and supplied power to remote radar stations. Installed underground power lines, fiber optic lines and transformers. This was a critical security project with Phase 1 performed during the winter.